E-mail this story
IB Pier closed for repairs
The Imperial Beach Pier will be closed for a week starting Monday so that three 60-foot-long pilings can be replaced and other repairs are made to the structure.
November 16, 2009

The Imperial Beach Pier will be closed for a week starting Monday so that three 60-foot-long pilings can be replaced and other repairs are made to the structure.
November 16, 2009